Voxility IR2 is a brand-new Bucharest datacenter near two major campuses, offering NxData-1 and NxData-2 connectivity with top-tier infrastructure for large deployments.
Commitment
month 1 year 2 years 3 years
Prices do not include taxes.
The price is for a full calendar month, regardless of how many days are within that month. You can request to cancel the service anytime ("no contract"), but the service will be terminated, regardless if it's used or not, in the last day of that month.
Quantity
Monthly
$ 779 45
+
Usage
One-Time Setup
$ 279 65
Delivery in
8 weeks
Product Specifications
GOOD FOR
Voxility IR2 is a brand-new Bucharest datacenter near two major campuses, offering NxData-1 and NxData-2 connectivity with top-tier infrastructure for large deployments.
DATACENTER
Voxility IR2 Bucharest
ADDRESS
Dimitrie Pompei no. 9-9A, building 2, district 2, Bucharest, Romania
GUARANTEES
99,999% power using both lines
WHO'S HERE
All from NxData-1 and NxData-2 through a cross-connect
SPEED TEST
If you choose to have Voxility as an upstream IP transit provider in this location, you can use the following link to test speed and trace route
Location
Space
Type and size of colocation space
SETUP
MONTHLY
Bring your own standard rack cabinet (47U x 60/80 cm wide x 120 cm depth)
-
-
47U Standard 19 inch rack cabinet (60 wide x 120 cm depth)
+$5015.85
-
47U Standard 19 inch rack cabinet (80 wide x 120 cm depth)
+$5833.38
-
Power Lines
SETUP
MONTHLY
2 x 16A / 230V redundant power lines in Voxility IR2 Bucharest – Each line is sourced from a different UPS and has its own circuit breaker that triggers when the line reaches its 16A rating. – Power lines are installed close enough to the rack cabinet to allow PDUs to be connected with their own cables. Ideally, the PDUs should have the same voltage and amperage rating as the lines. If they don't, they must be equipped with factory-installed circuit breakers. – Each power line has a single IEC309 16A 2P+E receptacle, allowing one PDU to be connected per line. – Ideally, equipment installed in the rack cabinet should have two power sources, each connected to a different power line to achieve power redundancy. – Equipment with only one power source should be connected in a balanced manner between the power lines and it will not be protected against failures in one power line.
-
-
2 x 32A / 230V redundant power lines in Voxility IR2 Bucharest – Each line is sourced from a different UPS and has its own circuit breaker that triggers when the line 32A rating is reached. – Power lines are installed close enough to rack cabinet to allow PDUs to be connected with their own cable. The PDUs, ideally, should have the same Voltage and Amperage rating as the lines. If they don’t, they must be equipped with circuit breakers from the factory. – Each power line has a single IEC 60309 (formerly known as IEC309) 32A 2P+E receptacle that allows to connect one PDU per line. – Equipment installed in rack cabinet ideally would have two power sources, each one connected to a different power line to achieve power redundancy. – Equipment with one power source should be connected balanced between power lines and they will not be protected against one line power failures.
+$29.75
-
2 x 3-phase 16A / 400V redundant power lines in Voxility IR2 Bucharest – Each line is sourced from a different UPS and has its own circuit breaker that triggers when the line reaches its 16A rating. – Power lines are installed close enough to the rack cabinet to allow PDUs to be connected with their own cables. Ideally, the PDUs should have the same voltage and amperage rating as the lines. If they don't, they must be equipped with factory-installed circuit breakers. – Each power line has a single IEC60309 receptacle, allowing one PDU to be connected per line. – Ideally, equipment installed in the rack cabinet should have two power sources, each connected to a different power line to achieve power redundancy. – Equipment with only one power source should be connected in a balanced manner between the power lines and it will not be protected against failures in one power line.
+$53.55
+$95.20
2 x 3-phase 32A / 400V redundant power lines in Voxility IR2 Bucharest – Each line is sourced from a different UPS and has its own circuit breaker that triggers when the line reaches its 32A rating. – Power lines are installed close enough to the rack cabinet to allow PDUs to be connected with their own cables. Ideally, the PDUs should have the same voltage and amperage rating as the lines. If they don't, they must be equipped with factory-installed circuit breakers. – Each power line has a single IEC60309 receptacle, allowing one PDU to be connected per line. – Ideally, equipment installed in the rack cabinet should have two power sources, each connected to a different power line to achieve power redundancy. – Equipment with only one power source should be connected in a balanced manner between the power lines and it will not be protected against failures in one power line.
+$434.35
+$476.00
2 x 3-phase 63A / 400V redundant power lines in Voxility IR2 Bucharest – Each line is sourced from a different UPS and has its own circuit breaker that triggers when the line reaches its 63A rating. – Power lines are installed close enough to the rack cabinet to allow PDUs to be connected with their own cables. Ideally, the PDUs should have the same voltage and amperage rating as the lines. If they don't, they must be equipped with factory-installed circuit breakers. – Each power line has a single IEC 60309 receptacle, allowing one PDU to be connected per line. – Ideally, equipment installed in the rack cabinet should have two power sources, each connected to a different power line to achieve power redundancy. – Equipment with only one power source should be connected in a balanced manner between the power lines and it will not be protected against failures in one power line.
+$898.45
+$940.10
Power Consumption
SETUP
MONTHLY
1 kW committed power draw from all power lines installed in full rack cabinet - A power draw of 1 kW is approximately equal to a current of 4.3A at 230V, resulting in a power consumption of 720 kWh per month. This is equivalent to using 2057 watts of primary server sources at 35% capacity - Going above the committed power draw may result in excessive usage fees until this power consumption plan is upgraded
-
-
2 kW committed power draw from all power lines installed in full rack cabinet
- A power draw of 2 kW is approximately equal to a current of 8.7A at 230V, resulting in a power consumption of 1440 kWh per month. This is equivalent to using 4110 watts of primary server sources at 35% capacity
- Going above the committed power draw may result in excessive usage fees until this power consumption plan is upgraded
-
+$291.55
3 kW maximum power draw from all power lines installed in full rack cabinet - A power draw of 3 kW is approximately equal to a current of 13A at 230V, resulting in a power consumption of 2160 kWh per month. This is equivalent to using 6170 watts of primary server sources at 35% capacity - Even if each power line or all power lines combined can support a higher power draw, the data center does not allow it due to several reasons: a) the UPS provisioned capacity cannot handle a higher power draw, b) there would be a loss of redundancy in case load moves to a single line due to one line power failure, c) the cooling provisioned capacity for this rack cabinet would be exceeded - Going above the power draw threshold can put you at risk of power disconnection - It is recommended to draw almost the entire power allowed under normal usage conditions and configure the equipment to start randomly at power-up. This will avoid power-on spikes that might trigger the circuit breakers
-
+$581.91
Support
SLA for Colocation
SETUP
MONTHLY
Standard SLA for a Colocation service - 'Remote hands'
This SLA assumes the equipment is installed by customer and works well, no hardware changes are expected and only occasional simple emergency requests might be required.
Standard SLA includes unlimited number of requests for power cycles, visual inspection of equipment, access to a shared remote KVM along with very simple tasks for hot-plug components or cables like 'plug / unplug' or 'take .. from .. and replace .. '.
The SLA does not cover installation/removal/replacement of non-hot plug components or any hardware or software troubleshooting.
Requests under this SLA are executed first come, first served by 24/7 on-site datacenter personnel under the assumption they are 'urgent'. Under normal operation conditions such requests are executed in less than 30 minutes, but no guarantee is provided. .
-
-
Expert SLA for a Colocation service - 'Remote Hands and Expert Installation' This SLA covers two batches of equipment physical installation in rack cabinet at a agreed date and later, packaging and shipping. Cost of packaging material, shipping and import/export duties are charged separately. It also covers expert cabling of Internet, private, management and out-of-band networks and the cost of all UTP cables and patches. It doesn't cover fiber and twinax patches that must be purchased separately. The Expert SLA includes software configuration of ILO / DRAC / IMM management ports and troubleshooting to power up the equipment. The post-install maintenance includes unlimited number of requests for power cycles, visual inspection of equipment, access to a shared remote KVM along with very simple tasks for hot-plug components or cables like 'plug / unplug' or 'take .. from .. and replace .. '. The SLA does not cover installation/removal/replacement of non-hot plug components or any troubleshooting outside the two initial installation/removal batches. Maintenance requests under this SLA are prioritized over Standard SLA and executed first come, first served by 24/7 on-site datacenter personnel under the assumption they are 'urgent'. Under normal operation conditions such requests are executed in less than 30 minutes, but no guarantee is provided.
+$714.00
-
Ultimate SLA for a Colocation service - 'Everything you need'
This SLA assumes the equipment must be imported, installed, removed and exported in at least 3 batches every year and equipment or cabling might need expert troubleshooting, including replacing of non hot-plug components. This is the case with companies that changes their infrastructure frequently.
SLA covers unlimited batches of equipment physical installation at agreed dates in rack cabinet and at a later date packaging and shipping. Cost of packaging material, shipping and import/export duties are charged separately.
It also covers expert cabling of Internet, private, management and out-of-band networks and the cost of all UTP cables and patches. It doesn't cover fiber and twinax patches that must be purchased separately. The Ultimate SLA includes software configuration of ILO / DRAC / IMM management ports and troubleshooting to power up the equipment.
The post-install maintenance includes unlimited number of requests for power cycles, visual inspection of equipment, access to a shared remote KVM along with expert tasks for hardware troubleshooting and replacement using spare parts available on site.
Maintenance requests under Ultimate SLA are of highest priority and executed first come, first served 24/7 by Voxility own on-site datacenter personnel. Under normal operation conditions such requests are executed in less than 30 minutes, but no guarantee is provided.
+$1190.00
+$238.00
Commitment
month 1 year 2 years 3 years
Prices do not include taxes
The price is for a full calendar month, regardless of how many days are within that month. You can request to cancel the service anytime ("no contract"), but the service will be terminated, regardless if it's used or not, in the last day of that month.
Quantity
Monthly
$ 779 45
+
Usage
One-Time Setup
$ 279 65
Delivery in
8 weeks